Early works to prepare the site for construction commenced in January 2020 and continued into 2021 across two packages of works - Early Works Package 1 and Early Works Package 2. 

Package 2 of early works for the Liverpool Hospital redevelopment was delivered by contractor, Multiplex. The works in this package included:

  • construction of a temporary education facility on Eastern Campus
  • reconfiguration and connection of P1 and P3 car parks
  • temporary relocation of engineering office, distribution centre and telephone switch room
  • new kitchen facility
  • new mortuary
  • refurbishment works.
These work zones are detailed in the map below.

The impacts to our hospital visitors included:
  • reduced parking in P1, P2 and P3 car parks (accessible parking spaces will be maintained where possible)
  • alternate pedestrian routes around the hospital
  • potential dust, noise and vibration during demolition.

Should you have any questions, please contact the LHAP team on (02) 8738 6670 or email SWSLHD-LHAP@health.nsw.gov.au

We thank you for your assistance and appreciate your patience as we build the Liverpool Health and Academic Precinct.
 
LOCATION OF EARLY WORKS (PACKAGE 2) ON THE HOSPITAL CAMPUS200526-LHAP-Campus_map_Package-2.png

Dust, noise and vibration

Restricted access to the campus traffic bridge.

Please follow signage and directions for your safety, and allow extra time in case of delays.